You are here: What Development is Permitted?

One of the many reasons given for the elongated timescales in completing housing developments and other building projects was the length of time in took to negotiate the planning system. This was due to the sheer volume of applications, many of them for small building projects being received by local planning authorities.

It was with this in mind that the government introduced the Town and Country Planning (General Permitted Development) Order 1995 which was updated with the introduction of The Town and Country Planning Regulations 2015. This was in general, intended to be a mechanism to free up time in planning authorities and saw the introduction of Permitted Development Rights. These were rights granted by the Secretary of State allowing the development of minor building projects without the need to apply for planning permission, provided the projects complied with a set of restrictions and provisos.

Permitted development
Permitted development

These restrictions and provisos are too numerous to address here but details can be had by searching on https://www.gov.uk/government/publications/permitted-development-rights-for-householders-technical-guidance but be warned, make sure you are sitting comfortably before you begin because it may take you some time to work through it. To complicate matters even further, Permitted Development Rights are granted by parliament rather than by local authorities, which means that different rules apply in each of the devolved nations.

 The main restrictions to a domestic extension include the footprint, height and location of any construction. A Single storey rear extension can come out by a maximum of 3 metres for a semi-detached, terraced and link-detached houses, and by 4 metres on a detached house. The height of a rear extension is limited to 4 metres, with any part of the roof falling within 2 metres of your boundaries restricted to a maximum height of 3 metres. It is worth noting that a two storey rear extension may be possible under Permitted Development with the same size restrictions applying, other than that of the height. A front extension is not covered by Permitted Development and planning permission would be required.

A single storey side extension is also possible but should not exceed half the width of the original house. The same size and height restrictions apply as with a rear extension, however two storey side extensions don’t fall under permitted development rules.

Attic or loft conversions are possible under Permitted Development, provided you adhere to certain restrictions, mostly regarding the use of dormer windows. These are not allowed on the front elevation of the property and have restrictions on size and configuration. Velux style rooflights are permissible on front elevations. It is also worth noting that the total increase in roof volume created by the conversion should not exceed 50 cubic metres for a detached or semi-detached property, or 40 cubic metres for a terraced house. The loft access staircase to your new space must have head height clearance of at least 2 metres.

Converting your garage to living space is a common way of achieving additional accommodation and in most cases will not need planning permission, except in the case of a detached garage, which may need permission for a change of use. An integral garage is much simpler to convert as it is already part of the structure of the house and will require only an extension to the existing electrical system. If you are installing a toilet or any other facility which will require running water, be aware that the water will need to run out as well as in, so a waste pipe would need to be connected to the existing waste outlet. It may also be worth taking advice on the potential need to upgrade your central heating boiler as the existing one will have been sized on the demand from the original accommodation.

The difficult part of Permitted Development is being certain you’ve interpreted the rules correctly and satisfied all the caveats and criteria which the system demands. The best way to be certain you are complying is to apply for a Lawful Development Certificate. 

You will be required to provide details of your intending project, showing that, to your mind, it complies with your Permitted Development Rights and submit this application to the council in the same way as you would a planning application. It is however not a planning application, you already have permission, at this stage you are telling the local authority planning officers what you are about to build and you are checking that what you want to do complies with your Permitted Development Rights. Your application can take about the same length of time as a planning application but you are not relying on planning officers’ opinions or neighbour objections, you are determining legally that your proposed build is in accordance with the Permitted Development rules.

A Lawful Development Certificate serves two purposes. It’s a good way of being certain that you are meeting all the requirements of Permitted Development before you start building. This could save any awkward and expensive problems during and after the build and if at a later date you should want to sell your property you can prove that the work was all legal. The cost of a Lawful Development Certificate for a proposed building project is around half the normal planning permission fee.

Neither Permitted Development nor a Lawful Development Certificate negate the requirement for other documentation. For example you will still need to show that your build conforms to current Building Regulations and if it is not a detached property, you may need to initiate a Party Wall Agreement with your neighbours.

As well as the restrictions imposed on Permitted Development Rights there are instances where these are not applicable. Permitted Development Rights cannot be applied to flats and Maisonettes, in which case planning permission would need to be sought.  Local authorities also have the right to limit permitted development rights for certain areas, often as a condition of planning permission on new housing developments. This is done by issuing an ‘Article 4 directive’ – which refers to Article 4 of the General Permitted Development Order. This might happen for instance, if they want to preserve the character of an area.

As with all planning and building projects, if in doubt about any aspect of your projects, consult a professional and take advice. If you think professional advice is expensive, try getting your project wrong.

If you are looking to make some home improvements, you may find some of these services useful