You are here: Planning permission granted: what next?

From concept to completion: the key stages

Congratulations! Gaining planning permission for your home extension is a significant milestone - bringing you one step closer to realising your dream space. However, securing consent is just the beginning. The next stages are crucial to ensure your project is well built and meets safety standards.

A concrete lorry delivering concrete to the start of an extension on the side of a house
After planning permission

Assembling your team

If you’re already worked with an architect to obtain planning permission, it’s often beneficial to continue with them through the next stages. The Royal British Institution of Architects (RIBA) explains: “Unless your project is very simple, it makes sense to at least talk to an architect before you get going. A good architect will propose solutions and develop your brief so that it reflects your aspiration. They will help with the approvals required before the project can go ahead, including preparation of applications for planning consent (where needed) and for building regulations approval. An architect can also help you to find a good, reliable builder and provide quality control over the build, helping you to complete your project efficiently and manage the budget.

“How much or how little you commission an architect is up to you – from coming up with the initial design to seeing your project through to completion.”

Your architect can also advise you on assembling a professional team. It may be necessary to hire a surveyor to identify site constraints, such as underground sewers - or bring in a solicitor if a party wall agreement is needed. A structural engineer is critical; they will assess existing foundations and if underpinning is required, for example. For larger projects, you may need a quantity surveyor to estimate costs based on your plans. Other recommended consultants might include ecologists or landscape designers.

Continuing with the same with the same architect ensures continuity and streamlines communication.

Building Regulations Drawings

While planning permission focuses on the external appearance and impact of your project, building regulations ensure the safety and structural integrity of the building. Compliance with these regulations is mandatory and covers issues such as fire safety, energy efficiency and accessibility.

To prove your project meets legal requirements, you’ll need to submit a detailed set of building regulations drawings with notes, showing construction methods and details. For example, wall sections, beam calculations, stair details and insulation type. The building regulations package will also include drawings and calculations from your structural engineer to ensure your building is structurally sound, for example beam calculations and load-bearing requirements.

Packed with technical jargon and obscure numeric references, building regulation drawings can appear incomprehensible to the lay person. Given the technical knowledge required, hiring a professional is essential. Most architects offer this service, but for smaller projects a qualified architectural technologist can be a cost-effective alternative.

Hiring a builder

The next step is to find the right builder for your project. Send a detailed brief, your plans and building regulations drawings to at least three contractors for quotes. Further detailed drawings and information may also be included in the tender package, depending on the project. When comparing bids, ensure you understand exactly what is included and clarify any omissions as this can lead to unexpected costs later.

A well drafted contract is crucial. It should outline payment schedules, warranties, dispute resolution and termination clauses. For larger projects consider using the JCT (Joint Contracts Tribunal) Contract, designed to protect both you and your contractor.

Setting a realistic budget

Setting a comprehensive and realistic budget is crucial. This budget should include  professional fees, materials, labour costs and a contingency for unforeseen extras, typically 10-15% for unexpected expenses. Regularly reviewing and updating your budget and using spreadsheets can help track spending effectively.

Additionally, check if your home insurance covers building work for a new extension. You will need to notify your insurer that you are planning structural changes to your home. Check your building contractor has insurance to cover the cost of construction and public liability insurance for third party injuries or damages, for example to workers on site.

Neighbours and the Party Wall Act

If your property is a semi or a terraced home, you will need to comply with the Party Wall Act 1996. There is a strict process to follow to ensure you don’t damage neighbouring properties when doing building work, for example converting lofts or removing chimneys – anything that might affect the structural integrity of a party wall.  Additionally, you’ll need to serve notice and sometimes obtain written consent from neighbours when building near or on shared boundaries, for example digging new foundations. This applies to detached houses, too.

Your neighbours may then instruct party wall surveyors – at your expense - to protect their property interests.

Sticking to the approved plan

Changing your mind after planning approval can lead to complications. Minor adjustments may be allowed under what is known as a non-material amendment application, for example to the size of windows. However significant changes often require a new planning application, leading to delays and additional costs.

Failing to stick to the approved plan can result in enforcement action by your local authority, including potential demolition of unauthorised work. Always consult your local authority before making changes. Frequent changes of mind can also lead to disputes with building contractors.

Site preparation and utilities

Consider hiring portable toilets for workmen, so they don’t have to use your loos. Discuss with your builder waste disposal. Check if skip hire is included in your contract – or needs arranging separately and by whom. If you don’t have your own driveway to park a skip, you may need to apply to your local council for permission to leave it in the road in front of your home. 

If extensive work is required, you may need to move out temporarily or at least discuss with your builder how to minimise dust and disruption during the building phase.

Completion and handover

At your project nears completion, final inspections will be required by either your local authority’s building control department or an approved inspector to obtain a completion certificate. Your building contractor or architect should inspect the work and create a snagging list of any defects or unfinished tasks. Most contracts have retention payment clause – withholding a portion of the final payment until all issues are resolved. If an architect is managing the building contract, they will inspect the work and authorise final payment.

Successfully extending your home requires careful planning and the right expertise. By assembling a team of skilled professionals, you can create a beautiful and functional space that enhances your lifestyle and most valuable asset.   